Why combine asphalting and site improvement
When a property is completed in separate stages, unnecessary costs often arise: pavement is laid first, then drainage, curbs, elevation differences or convenient access are remembered later. Integrated asphalting and site improvement allows the whole property to be planned from the start.
This approach is suitable for yards, parking areas, industrial sites, warehouses, depots, access roads and commercial properties in Almaty.
Proper grading and a strong base affect safety, ease of movement, the absence of puddles and asphalt service life.
What site preparation includes
The role of curbs and drainage
Curb installation fixes the pavement edge and separates the roadway from lawn, sidewalk or pedestrian areas. On sites with significant water flow, trays and correct slopes are also important. This may require drainage tray installation.
If water remains on asphalt, the pavement deteriorates faster. That is why slopes, drainage and base density must be planned before paving starts.
How to know when a property should be improved as a complete project
- the site has elevation differences;
- a parking area or driveway must be organized;
- there is old pavement that must be removed;
- curbs, trays or a perimeter apron are planned;
- the area needs to be brought into a neat condition quickly.
Asfaltcom KZ provides asphalting, base preparation, grading and turnkey site improvement so the area looks neat and withstands real loads.